Monday, February 20, 2012

20th February 2012

With good weather we have had some activity over the past week or so, block layers were onsite late last week and put up one wall of the garage at the side against the neighbours wall. Today concreters were back onsite to prepare for the slab, they say it will take 3 days and I don't envy them with all the steelwork in place. Concrete is planned for Thursday, framing is scheduled to arrive on Friday and next Monday the chippies will be back to start framing. All things being equal and weather permitting.
Skies the limit

Main Portal

Not what you would call flimsy

Even the Boss is into it

By using a large crane steel was lifted from one end of the block to the other  without shifting.

Building the meccano set

Gives you a good idea of the size of the main structural steel.

All fitting perfectly and more to go.